on 11-01-2015 7:14 PM
Hi,
OSS note 2227501 - SAP_UI 7.50 minimal installation requirements says that SAP_UI 750 can be installed on top of NW 7.40. Has anyone tried it out? Any problems?
Best Regards,
Tobias
We installed it and so far we had no problems at least with UI5... So I close the question.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
Are you working with different server for the Back / Front end or central server for both ?
We are working with Back/Front server topology and thinking to upgrade the front to
SAP_UI 750 in order to achieve 1.30 but the Back end is still with add-on 1 ( because we are with SP10 ).
Any one tried it ?
Thanks,
Arie.
Hi Arie,
same thoughts here. Initially though about upgrading only frontend to SAP_UI 750 in order to have access to newest UI5 libs. However on a second thought it would be nice to get access to new stuff in FPM and WDA as well in the backend. Therefore we will probably try pushing both to SAP_UI 750 in the sandbox and see what whether we're happy with it.
Bottom line: no experience yet ...
Cheers,
Alex
Hi,
I tried to update to SAP_UI 750 in NW 7.40 regarding note "2244507 - MOPZ: How to include SAP_UI 750 in NetWeaver 7.4 system in Maintenance Optimizer", but it didn't work.
Can someone please tell me how to update?
Best regards,
Oliver
Hello Tobias,
Thank you for your prompt reply. I have to upgrade to SAP_UI 750, as we want to upgrade SAP_BASIS SP11 to SP12 in NW7.4 , this requires SAP_UI 750. As there is little information about how to upgrade from SAP_UI 740 to SAP_UI 750, so I am a little confused that we can directly upgrade from SAP_UI 740 SP14 to SAP_UI 750 or we must first upgrade SAP_UI 740 SP14 to the highest SP15 and then move to SAP_UI 750?
Best regards,
Leon
Tobias,
We also installed SAP_UI 750 on Netweaver 7.4 ABAP successfully but it impacted us on Fiori Launch Pad (FLP) on Enterprise Portal (EP) Netweaver 7.4.
Do you have EP and did you have any issue on FLP?
Thank you,
Murtaza Lokhandwala
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Based on below note we decided to not to move forward and restore the system from the backup.
1. 2261419 - Maintenance Strategy for FLP on Portal
Thank you,
Murtaza Lokhandwala
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.