cancel
Showing results for 
Search instead for 
Did you mean: 

My scenario is IDOC to FILE

Former Member
0 Kudos

I have 3 clients(700,800 & 900) in R/3.

Idoc(orders05) is comming from any one of the client.

I am sending this idoc to non-sap system as it is.

Please tell me the scenario, How to configure my Busyness Systems and flow?

Accepted Solutions (0)

Answers (4)

Answers (4)

turmoll
Active Contributor
0 Kudos

hi,

Here you have explained the scenarion detaily: <a href="https://www.sdn.sap.comhttp://www.sdn.sap.comhttp://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692">A Beginner’s Guide to SAP XI Settings, Part I</a>

regards,

Jakub

Former Member
0 Kudos

HI,

As explained by tigerwood and ahmad ,

do accordingly also see the below links

/people/prateek.shah/blog/2005/06/08/introduction-to-idoc-xi-file-scenario-and-complete-walk-through-for-starters - IDoc to File

IDOc testing - /people/suraj.sr/blog/2005/12/29/generate-test-case-for-an-idoc-scenario

idoc settings /people/ravikumar.allampallam/blog/2005/02/23/configuration-steps-required-for-posting-idocsxi

Regards

Chilla

Former Member
0 Kudos

Hi Vijaya Laxmi,

For this you need to create 3 Business systems for each client in SLD.Import Idoc structure from R3 sytem,Create target data type,Message type,Message Interface.Perform your MM & IM in Integration repository.After doing this successfully switch to ID.

In ID:

Create a configuration scenario,

perform 3 Receiver Determinations,3 Interface Determinations,3 receiver aggremnets.No need to perform Sender agreements when the Idoc adapter direction is choosen as a Sender.However you have to do ALE settings from R3 system to XI and XI to R3 system.

Make sure you should perform these ALE settings for 700,800,900 clients to XI(SM59,WE20,WE21) and XI to 700,800,900 clients(SM59,IDX1,IDX2).Here IDX2 is not mandatory.Check this for idoc metadata is having correctly or not

Hope this will give the clarity for this requirement.Let me know if you need any queries.

Cheers

Tiger Woods

Former Member
0 Kudos

Hey Vijaya

jst as Tiger woods pointed out,do in the same way,few thing which u dont necessarily have to do are any settings from XI to R/3

as ur scenario is IDOC to file,nothing needs to be done for XI to R/3,u only have to do settings from R/3 to XI

so u dont need any sm59 in XI,no IDX1,no IDX2.

jst do sm59 in R/3,we20,we21,bd54.

thanx

ahmad

Former Member
0 Kudos

Hi vijaya laxmi ,

For each client you have to maintain one business system and in receiver determinatoin step in cofiguration you have to include all 3 business systems and according to clients you have to mantain alll required steps at each client like

port creation and partner profiles..rfc destinations..etc..

regards,

ramesh.