on 10-25-2015 3:09 PM
Hi,
We have a scenario where our ECC landscape is going under an upgrade.
In this scenario, do we need to Stop the replication Jobs from SLT side.
Since the ECC upgrade is going on a shadow instance, we have a plan to stop the SLT replication (master Job) just before the down-time starts for ECC. For other Pre-processing steps for ECC upgrade, can SLT master jobs can be switched on ?
Thanks
Mrityunjay
Hi Mrityunjay,
Yes, Replication can be on while upgrade pre-processing is running.
Stop the replication before downtime starts and it can be started after the upgrade.
Thanks
Dass
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Mrityunjay
Have a look to the SLT operations guide, you will find the following mention :
If you use the correct SAP NetWeaver Basis Release, or the related SAP Notes for the related SAP NetWeaver Basis release, the created SAP LT Replication Server DB triggers will remain active during potential Data Dictionary changes (adding of non-key fields) or will be automatically deleted by the Data Dictionary tools.
Knowing this, you can in principle continue to have the triggers active and only need to re-load those tables where the triggers have been deleted during a software maintenance activity.
The SAP LT Replication Server checks for missing DB triggers and reports this error condition.
So you have to stop the replication jobs (as any other jobs interacting with the upgraded system). And you will have to check afterwards the lost triggers.
Regards;
Frederic
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.