SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

ISU_SIMULATION_PERIOD_BILL for grouped installation

vapor_anomaly
Explorer
0 Kudos

Hi,

We have configured installation grouping data exchange as below:

For Secondary to Primary: ZQUAN_MPRN -> ZSUPP_SITE

For Primary to Secondary: ZSUPP_SITE-> ZTOT_SITE

We always bill the primary installation before the secondaries.

And we use the operand ZTOT_SITE for calculations when billing the secondary.

The problem is, when we perform billing through EA00/EAMABI, the operand is filled with the correct values and the calculations are correct.

When we use the FM ' ISU_SIMULATION_PERIOD_BILL' the operand has 0 value.

Is there anything we are missing.

We call the FM with the below parameters:

X_VERTRAG = The correct ISU contract

X_BEGABRPE = 01.07.2015

X_ENDABRPE = 31.07.2015

X_BILLINGRUNNO = 1

X_NO_UPDATE = X

X_SIMULATION = 06

Any input will be much appreciated.

Thanks.

4 REPLIES 4

AmlanBanerjee
Active Contributor
0 Kudos

Hi,

Is the ERCHV operand indicator checked for the operand ZTOT_SITE?

Thanks,

Amlan

0 Kudos

Hi Amlan,

It is checked.

As per the the documentations it should be set, right?

Thanks.

Former Member
0 Kudos

Hi,

Please refer the cookbook available for Installation Groups. It specifically talks about steps to be taken for simulation scenarios( It should be 03-Simulate All Open Billing Orders of an Installation) . I am attaching just one paragraph here.

Hope this helps.

Cheers,

Rakesh..

sapisurdg.wordpress.com

0 Kudos

Hi Rakesh,

Thanks for the answer.

Will check it out.

Thanks.