Bill of material change component issue

Former Member
0 Kudos

Dear Experts,

We are facing issue in BOM change with change number.

We replaced A,B,C with X,Y,Z in the BOM with a change number with valid

from date in 2016.

But the system showing the requirement of X,Y,Z in current date,

that is in 2015.

Also it is showing the requirement of A,B,C also.

We need only A,B,C requirment only which is present in the current BOM

and not X,Y,Z which is valid from 2016.

We noticed that, two change numbers with same valid from date, used to change  X,Y,Z

with INN and IND status.

Please explain, how to remove the requirement of X,Y,Z from the system.

Thanks in advance.

Regards,

Suresh.

Accepted Solutions (0)

Answers (3)

Answers (3)

dineshcbe
Active Participant
0 Kudos

Hi,

Pls match the screen with yours and get back.

Thanks With Regards,

Dinesh V.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

You can do this simply with one change number,

In CC01 create the change number with valid from date in 2016

In CS02 change the BOM use the change number created  and delete items

A,B,C  and add items X,Y,Z in the BOM.

Then go to CS03 and check them item details you will get ABC valid yup to 2016 and from 2016 XYZ will be valid.

You can also test by create two production one with current date and another in 2016 and check the components details.


Best Regards,

R.BRahmankar


Former Member
0 Kudos

Hi Rupesh,

For we added XYZ valid from date on 2016 only.

But still showing the requirements in 2015. the change numbers with INN & IND status.

How to block the XYZ requirements now? Please explain.

Regards,

Suresh.

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Have you created change master with CC31? could you please share the screen shot?

Best Regards,

R.Brahmankar

dineshcbe
Active Participant
0 Kudos

Hi,

Also share the screen shoot of OS27.

Thanks With Regards,

Dinesh Kumar V.

former_member185450
Active Contributor
0 Kudos

Dear Suresh,

Please put the validity date as 31.12.2099 for that ECN Number which is having XYZ components then release the Global key for that ECN..

if it gets impact for both ABC and XYZ in that situation let it the validity as 31.12.2099 then create new ECN with correct ABC Components by keeping the validity as todays then release that new ECN

hope it may help you..

Regards,

Venkatesh

Former Member
0 Kudos

Hi Venkatesh,

Thanks for the clarification. I created 2 change numbers for XYZ with same valid from date.

So do i need to change the validity for both the change numbers ( one change number with INN status and another one with IND status).

Regards,

Suresh.

former_member185450
Active Contributor
0 Kudos

Hi Suresh,

Could you please share the status as well as objects screen shots for those two ECN Numbers

then only we can be able to take an action on this

Regards,

Venkatesh..

Former Member
0 Kudos

Hi Venkatesh,

Please find the screen shots.

Regards,

Suresh.

former_member185450
Active Contributor
0 Kudos

Hi Suresh Kumar,

I am unable to read your screen shots..

The functionality I'll explain to you i.e. By mistake you have created and released the ECN which is having XYZ which is the replacement of ABC

But now system is considering the both ECN Numbers for generating the requirement

so please analyse based on valid from date and put the validity of XYZ ECN as a future date then rerun the MRP

Regards,

Venkatesh..