Hello Guru's
I would like a generate separate change numbers for each BOM Items added to my engineering record.So that each BOM can have their own valid from date. I think i can achieve this through change number handling at Item level.
I need expertise advise to see if I can automate this so that a change number gets generated automatically for each BOM item.I can use the method CREATE_ECN_AT_ECR_ITEM.
Suggestions would be helpful.
Thanks & Regards
Jo Pz
Hi Jo,
IS it not possible with SPRO configuration Make setting for Engineering Record --> Change Number Handling at Item level.
It should work I believe,
Thanks and regards,
Niketan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Niketan,
Yes, I was able to create change master at Item level.But I would like to know if I use this method CREATE_ECN_AT_ECR_ITEM, is it possible for me to create the change number automatically with a similar number range of the Lead change number.
For eg: If my lead change number is 15102015, I would like to have my change master at the item level by 15102015-1, 15102015-2.....etc.
Kindly advise.
Jo