on 10-06-2015 9:54 AM
Following Guilherme Balbinot's post on the blog:
I would like to ask about possiblitity of connection several Solution Managers 7.1 to one SAP system.
Let's take example:
There is a need to run full option of OCC (Operational Control Center) for several ERPs in Solution Manager 7.1.
The question is:
Is it possible to connect those ERPs to several Solution Managers or to only one to be able to run OCC?
Following SAP Note 1365123 it looks that is possible, but is it let's say recommended by SAP?
Thanks for answers!
Anna
Hi Anna,
For OCC, you can go ahead with a single Solution Manager to connect multiple systems or run multiple Systems for different landscape.
The number of systems to be connected to Solution Manager is key as you don't want your system performance to deteriorate. Also what all functionalities you plan to implement will play a key role.
You must have checked below help link from SAP
Operations Control Center - SAP Solution Manager - SAP Library
There are few links below that can help you perform sizing and housekeeping.
Performance Optimizations - Technical Operations - SCN Wiki
Regards
Aditya Khorana
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.