cancel
Showing results for 
Search instead for 
Did you mean: 

MRP batchjob to be cancelled on WM stock migration?

Former Member
0 Kudos

Hi,

I want to know whether we need to cancel batchjob which run for MRP while we are doing stock migration to WM.

We will be using existing storage location only. We will move stock to dummy sloc & after activation of WM will move it again to its original sloc.

Thanks,

Kiran

Accepted Solutions (1)

Accepted Solutions (1)

MANIS
Active Contributor
0 Kudos

During MRP run you need to check the current stock status from the storage location. Now you mentioned that you will be using the existing storage location as WM storage location. Now question here, is the frequency or time duration of your MRP batch job allows you to move the stock from existing storage location to Dummy and return back the stock to original storage location so that right calculation of stock will take place.

I believe you are the only person who can answer this question rather then anyone on SCN hence decide accordingly whether the job should be stopped or continue

Answers (0)