cancel
Showing results for 
Search instead for 
Did you mean: 

Overhead Calculation at Unit Costing Level

former_member224763
Participant
0 Kudos

Hello All,

We have one requirement.

We want overhead calculation at sales order level. But requirement class costing method is 2. How can i proceed with this.

We want to charge different Overhead rates for different materials. As this set is maintained in Costing Sheet.

following is requirement class setting.

BR//KP

Accepted Solutions (0)

Answers (1)

Answers (1)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

You have to take Material/OH key combination in rate calculation  and assign in Material master

kamal