Hi Experts,

Issue - Dynamic Modification Rule is not working.

Details Scenario:-

DMR Level - 3 Dynamic Modification at Char. level

Only one operation in inspection plan.

Two characteristics are assigned to operation.

10 FA

20 SRI

We are not using sampling procedure.

Please find below DMR setting.

DMR - FA1 (assigned to char. FA)

DMR - CL1 (assigned to SRI)

FA1

Dynamic Modification - For usage decision

Stage

InspSev

Skip

Ist

Short text

Stc

  1. No. of inspection
  2. Max. Skip Duration

New Stage

Rejection

New insp. stage

1

1

N

Y

FA

Y

1

2

1

1

2

Y

N

SRI

Y

30000

455

2

1

1

Issue: The stage change is not happening for FA1 DMR when I receive a second lot from same vendor.

Quality levels are not updating if I check in QDL3. Lot number and UD code is not updating in QDL3.

Lots w/o usage decision is updating as all the lots are already has status UD.

First char. has to skip as per DMR for second lot once the UD is done for first lot.

I have not rejected any characteristic in RR.

The lots are for same vendor.

Please find the attachment for UD status once UD is recorded.

Thanks in advance.

Accepted Solutions (0)

Answers (5)

Answers (5)

0 Kudos

This message was moderated.

iyyappansapqm
Explorer
0 Kudos

Hi Akhil,

I'm new to SAP QM, I try to solve.

Can you please share the inspection type setup and sample determination method screenshot.

Regards,

Iyyappan S

0 Kudos

Hi Iyyappan,

Below is inspection setup

former_member185453
Active Participant
0 Kudos

Sampling procedure is require to use DMR at any level. first you need to create SP.

Also go through this thread.

Regards

S Ahmed

0 Kudos

Thanks Sarfaraz.

I have already gone through these threads. But didn't find the answer.

DMR is possible without sampling procedure as we are directly assigning the DMR in inspection plan for char.

awaiting your suggestions.

Martin_H
Contributor
0 Kudos

Akhil Tammiwar wrote:

(...)

DMR is possible without sampling procedure as we are directly assigning the DMR in inspection plan for char.

(...)

I am not sure if this is true. If you check SAP Help, the sampling procedure is not listed in the "prerequisites" section. But the first sentence in the "process flow" section starts with:

"You define a sampling procedure ...."

Did you try to test your issue together with a sampling procedure? Please do so to check if it works then.

MH

former_member185453
Active Participant
0 Kudos

.

Use the DMR level 2 and check, also Change New Stage value from 2 to 1 in Stage 2 (skip).

In your scenario: after one Insp. lot process (UD) the next lot's up to 29999 or after 9999 days should skip (no RR for those characters) isn't it.

Regards

S Ahmed

former_member185453
Active Participant
0 Kudos

Hi Akhil,

Please follow this thread:

hope this may help you to solve your issue.

Regards;

S Ahmed

0 Kudos

Thanks Sarfaraz,

I have seen the tread. But I didn't find the answer to my question.

As per my DMR the stage change should happen once the UD recorded for first lot.

For second lot the MIC should skip and this is not happening here.

Awaiting for your suggestions.

0 Kudos

Please find my DMR setting

former_member185453
Active Participant
0 Kudos

Hi,

Can you share DMR header data.

Regards

S ahmed