on 09-16-2015 9:57 AM
Hi Experts,
As we are upgrading the SAP PI version from 7.11 to 7.31. can any body please let me know what are the checks I need to perform as a SAP PI Consultant after upgrading the system? and also before upgrading?
Regards,
P R.
Hi,
As a PI consultant the below task needs to perform post upgrade
1) Validation of consistency on Design time (ESR)
2) Validation of consistency on runtime (configuration)
3) Validation of connection (RFC destination, JCO connection etc.)
4) Sanity check (test configuration in case of dual stack, ping test from channel etc.)
5) Monitor the message flow
regards,
harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.