cancel
Showing results for 
Search instead for 
Did you mean: 

LE-TRM setting

Former Member
0 Kudos

Hi

I have done a complete site configuration and would like to integrate with WM

I created a WH by copying 001 with additional setting as below

1.Interface - assingn site

2.Maintain source-des-mvt type

3.Make Confirmation - separate for wh

4.make confirmation - req for the storage type

But when I create TO for the putaway ( the TO is not maked with X in the TRM field )

any setting missing?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

The issue resolved , Reason - in OMLX txn for the storage type 902 under the WH ,  the tick in EQ and RC fields were missing.

Answers (1)

Answers (1)

MANIS
Active Contributor
0 Kudos

Take help from development team and put a breakpoint at line number 30 in the below shared fm to get an idea what is missing