How to find Work Centre ?

Hello Experts,

To be able to match open transfer requests with the work center that the material is assigned to in the routing to determine which supply area the control cycle should be created for.

To be able to check if a correct control cycle exists for the material, the work center consuming the materials, for the order LTBK-BENUM and material LTBP-MATNR is needed.


We haven't found the proper way to find the workcenter.


Once we have the associated workcenter we can check CRHD-PRVBE for the PSA with CRHD-ARBPL as the workcenter input.

After that we'll check for a proper control cycle in table PKHD, using CRHD-PRVBE and LTBP-MATNR as input.


Regards,


Ganesh