Hi Experts,

There is a scenario where single line item is assigned to WBS element and cost centre with 50% assignment each. I wanted to know if this scenario is supported by SAP.

Currently we are able to order the cart using the above scenario. But PO is not getting transferred to R/3 system, also status of the SRM PO shows error in process.

In case this scenario is not possible, it would be of great value if there is some logical explanations on why it is not possible.

We are on SRM7.02 ECS. Thanks in advance.

Regards,

Sachin

Accepted Solutions (1)

Accepted Solutions (1)

oliver_wurm
Active Participant
0 Kudos

Hi Sachin,

In ECC the Account Assignment Category is stored on PO Item Level (Field EKPO-KNTTP). So all account assignments of one PO item must have the same account assigment category. SRM can do that but not if an SAP ECC Backend is connected as ERP System.

Regards

Oliver

Former Member
0 Kudos

Many Thanks Oliver, that was really helpful