Hi All
First, Thanks for your all continuous support in GATP/PPDS area.
I have observed one strange case in Planned Order creation after Multilevel ATP check.
Planned Orders creating in "PPDS Application " . Please refer below screen shot.
Client rising issue : planned order created with PPDS application, not firmed, and no ATP check. why planned order not created with Multi level ATP check application, firmed, scheduled, ATP check and confirmed ? Please clarify on this.
Could you please explain why planned order is not created in "MATP check application " .
Regards
Sudhakar
Hi sudhkar
planned order getting firmed depends on your planning run , changes in order etc just refer below link which gives clear picture
http://help.sap.com/saphelp_scm700_ehp02/helpdata/en/4f/8e68f563b84063e10000000a421937/content.htm
confirmed realsed status it all depends on your production orders which you confirmed before quality inspection
scheduling status depend on your scheduling of orders and planning procedure .
Note 456756 - R/3->APO: Scheduling status for production orders
Regards
Virender
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi sudhakar
In Multilevel ATP check, the check results are stored in the ATP tree structure. Receipt elements are only generated later when the ATP tree structure is converted in PP/DS. This allows to improve performance during the check. capacity availability and component availability can only be rough (on a daily basis) and not as detailed as in CTP (in seconds).
As long as no receipt elements exist, the ATP tree structure exists in the SAP APO database. Requirements at component level are represented as aggregated quantity assignments. The ATP tree structure and the aggregated quantity assignments are deleted or reduced directly after the conversion into receipt elements. Matp is used to check availabilty like CTP .Both will call PPDS to generate planned order in different ways .
MATP check is used in industry areas in which a large part of the value-added activity arises at final assembly. The assemblies on the lower production levels have already been produced or procured before the sales order comes in, but final assembly is only initiated when the sales order arrives.
Example :PC Assembly .
Sales order can only be accepted when all required components are available. However, the configuration requested by the customer determines which components are needed specifically and this can only be checked at the time of sales order entry.
You can refer below link for better understanding
Multilevel ATP Check - Connection to Production - SAP Library
I hope it is clear now .
Regards
Virender.S
Hi Viru
But my question is related to the planned order creation application.
when planned order get firmed and in my case it is creating in PPDS application with no firm indicator but customer expecting planned order in MATP chek application with firm indicator.
How I can achieve this one. Where I can see firm settings in APO.
Thanks and Regards
Sudhakar
Hi Padam
You can define or increase your planning time fence so that order will come in to this Horizon and system will activate PP firm indicator for those order.
Go through below link there could be many reasons for getting firmed order
Firming Receipts - Production Planning and Detailed Scheduling (PP/DS) - SAP Library
Regards
Virender
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.