shelf life planning in PPDS -not populating some values

former_member309586
Participant
0 Kudos

Hi Gurus,

We are using the below characteristics for populating the shelf life values in APO.

LOBM_APO_SL_MIN  Min. shelf life/maturation in sec.    NUM 15.3

LOBM_APO_SL_MAX  Max. shelf life/maturation in sec. NUM 15.3

LOBM_APO_SL_UTC Reference time stamp of the batch NUM 15.0

LOBM_VERAB (Standard characteristic)

LOBM_VFDAT      (Standard characteristic)

LOBM_HSDAT      (Standard characteristic)

I have integration model with above characteristics and Batch.

I see min shelf life and availability date are not populating in APO in RRP3 for all the batches. Can any one suggest please?

We also wanted min shelf life need to be considered when we run the shelf life heuristic. Please suggest.

Thanks a lot in advance.

Thanks & Regards,

Rajesh

Accepted Solutions (1)

Accepted Solutions (1)

kenneth_snyder
Active Contributor
0 Kudos

Did you CIF over the class and characteristics and the batches from ECC?

former_member309586
Participant
0 Kudos

Hi Kenneth,

Yes i did. DO the users need to add available date in a Batch to pop up Min shelf life?

Please suggest.

Thanks & Regards,

Rajesh

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Please refer these SAP OSS notes,

751392 - Shelf life R/3 -> APO: Settings in R/3

810694 - Shelf life with initial production date not transferred

There is Enhancement  CIFSHLF1 Customer Exits for Shelf Life

Best Regards,

R.Brahmankar

Answers (0)