    Gurus,

We are having an issue with huge number of PReqs created every week during the SNP run. I was trying to see if something like ECC where you can say after a certain period group PReqs into a monthly bucket. We want to have PReqs by lot size for 8 weeks and then want to club it into one single PReq/Month.

Any guidance/help will be highly appreciated.

Thanks,

Subash

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Use BAdi /SAPAPO/SNP_PERIO_LS BAdI for Periodic Lot Size Grouping method CALC_PERIOD_LOTSIZE1 will be useful with some logic after 8 week only heuristic should consider lot size weekly and then group the lot size to monltly.

Also refer  note1383247 - BAdI method for controlling lot sizes in SNP Heuristics

BAdi /SAPAPO/SNP_HEU method CHANGE_LOCMAT  opportunity of influencing the lot sizes used during the SNP Heuristic run.

Best Regards,

R.Brahmankar

former_member182607
Active Participant
0 Kudos

Thanks Brahms....

I am going to try this and let you know...but still a great pointer in the right direction.