cancel
Showing results for 
Search instead for 
Did you mean: 

Common SLD for 2 PI systems- PI7.10 and PO 7.4 single stack

Former Member
0 Kudos

Hi PI folks,

We are working on PI7.10 upgrade project to PO 7.4 single stack.

We are considering to use existing SLD for pointing to a new PO system instead of new SLD installation.

Q1. Is it feasible? I think yes.Kindly confirm.

Q2.When a new PO installation is done. Does it ask to use existing SLD?

Q3.If we use common SLD for both PI and PO in parallel for some time, what is the impact on existing PI landscape which is having common sld for dev,qa and prod?

Q4. If we use common SLD, do we need to update existing ABAP Business Systems to change related integration server after PO installation?

Q5. What will be the impact on transport targets?

Q6. Do new SLD installation requires a separate hardware, if we consider to opt for it?

Kindly suggest all the impacts which could hamper our PO upgrade due to common SLD.

Many Thanks & Regards,

Anurag Garg

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

I am relatively new to PI and need to confirm our NW 7.4 upgrade plan.

We are planning for NW 7.02 PI dual stack to NW7.4 PO single stack with a single SLD.

I am planning to build the interfaces new to clean up our naming conventions but plan to leave the BS/TS names the same in the SLD.

Can we run the new interfaces parallel in our non-prod systems using a single SLD?

Can the SLD be upgraded to NW7.4 before any of the PI/PO upgrade work begins without breaking our production interfaces?

Am I missing a critical factor?

Thanks,

Stanette Balser