Hi everyone,

We’re planning to patch/upgrade our SAP systems, and are currently reviewing some strategies.

This is what our systems look like at the moment.

ECC – NW7.0 Ehp2 SP 6 with ECC6 Ehp5 SP3

CRM, BI, EP – NW7.0 Ehp1 SP 7

PI – NW7.1 Ehp1 SP 5

Solman – NW7.1 SP12

The following are some of the options we’re considering:-

Option 1

Patch the systems to the minimum support packages so that SAP can

support us on any IE related issues

Option 2

Patch the systems to the latest support packages

Option 3

Full blown upgrade to 7.3 or 7.4 for all systems

Option 4

Partial upgrade of specific systems (PI, BI, EP) to 7.3 or 7.4 first,

then the other will follow on a later stage

Would be great if we could get your opinion/feedback on the options?

Especially any issues or limitations with the options?

Also is it advisable to patch the systems one at a time, e.g. starting with PI first, then maybe BI, then Portal etc etc

Do you think this will impact any dependencies between the systems?


Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Kaet,

You can proceed with option3 full blown upgrade for all the system so that you will get latest functionalities.

ECC – NW7.0 Ehp2 SP 6 with ECC6 Ehp5 SP3 - second system need to be upgraded

CRM, BI, EP – NW7.0 Ehp1 SP 7 - Last option to do the upgrade

PI – NW7.1 Ehp1 SP 5 - First system(Always PI has to be at latest level)

Solman – NW7.1 SP12 - Already latest

Regards,

Raja. G

Former Member
0 Kudos

Hi Raja,

If option 3 was not possible, would option 2 be sufficient?

Also, have you patch one system at a time before?

For example, start with PI, then EP a few weeks later, and maybe CRM later etc etc

Regards,

Keat

Former Member
0 Kudos

Yes you can proceed with one system at a time. But do it in sandbox and check everything is fine before touching the actual landscape.

Regards,

Raja. G