We are currently running the SAP ECC-6 with EHP-4. We have decided to upgrade to SAP ECC-6 with EHP-6. Which version of SAP PI (Process Integration) best suits to what we are intending to do?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

As per my experience in BASIS.. SAP PI 7.1 is most stabilized one for ECC6 EHP6.

The same we are using from our implementation time and its working well.

Regards,

KK

Answers (4)

Answers (4)

former_member186851
Active Contributor
0 Kudos

Hello Naveed,

Its all based on what requirments you have.

I would suggest go with the latest Version PO 7.4 SP 12

If there are scenarios that needs to be done with CCBPM go with PI 7.4 SP 12

former_member184720
Active Contributor
0 Kudos

>>>If there are scenarios that needs to be done with CCBPM go with PI 7.4 SP 12

Curious to to know what 7.4 SP12 has got to do with ccBPM?

In general, it's observed that customer's would always install/upgrade the systems to n-1 SP.

And as per PAM, I see that 7.4 SP 12 was released very recently i.e. on Aug 17th 2015(3 days ago)

In addition, the reason i suggested to have >=7.31 is that, AFAIK EHP6 for ECC6 contains SAP BASIS 7.31 and as per the SAP recommendation your PI version should also be >=7.31.

former_member186851
Active Contributor
0 Kudos

If there are scenarios that needs to be done with CCBPM go with PI 7.4 SP 12

Curious to to know what 7.4 SP12 has got to do with ccBPM?

I mean PI 7.4(dual stack installation) where PO 7.4 (single stack) doesn't have CCBPM.

former_member184720
Active Contributor
0 Kudos

got it.So you were referring to installation type (dual stack/single stack) which was missing in the earlier reply.

BTW.. PO can have dual stack PI as well.

former_member186851
Active Contributor
0 Kudos

Yes Hareesh,

BTW.. PO can have dual stack PI as well.

I didn't know this , So CCBPM and NWBPM together?

arunneerolil
Contributor
0 Kudos

Ideally the highest PI version.

You can go with the PI version 7.4 SP12.

regards,

Arun

former_member184720
Active Contributor
0 Kudos

SAP recommends(it's a prerequisite that) middleware(PI) must be on the higher release than any other system in the landscape.

So i believe, your PI installation must be >= 7.31

pvishnuvardan_reddy
Active Contributor
0 Kudos

Hi Naveed,

Similar type of query has been discussed in the below thread. Can you refer it and let us know if you have any more queries on the same: