Hi Experts,

i want to create a company code without controlling area assignment. I have already configured a Company code without Controlling area assignment(Copied Company Code). But when i try to post entries it throws out an error " Company Code XXXX not assigned to a Controlling Area. Message No. KM820"

How can i configure Financial accounting only?

What are the configuration i should eliminate?

Kindly help.

Regards,

Accepted Solutions (1)

Accepted Solutions (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

At least one profit center is to be associated with each co code and profit center can't be created without controlling area, hence this relationship is a must in my opinion.

Wait for other help also on this.

Rajneesh

Answers (7)

Answers (7)

former_member222075
Participant
0 Kudos

Hej

All what you need to do is deactivate the document splitting for the relevant company code.

Best regards

JD

Former Member
0 Kudos

Hi. Thanks everyone for your feedback.

As per usage and experience of many experts it is understood that without controlling area financial accounting cannot be used.

Therefore it implied that at least a dummy controlling will have to created.

Best Regards,

Aziz

0 Kudos

Hi Aziz,

Please assign points to relevant helpful answers and close this thread.

Regards,

Prakash.

sean_xiao
Employee
Employee
0 Kudos

Hi Aziz,

If you have profit center assigned in the posting, the posting is not possible if company code is not assigned to a controlling area.

Regards,

Sean

Former Member
0 Kudos

Hi Aziz,

Check whether any profit center is assign to the line item during posting. Since the company code is not assigned to the Controlling Area.

Ensure no CO object is assigned.

regards,

jack

Former Member
0 Kudos

Hi

what kind transaction you doing for which posting the system is asking showing error

please provide details

Thanks

0 Kudos

This message was moderated.

Former Member
0 Kudos

Hi Prakash,

I have not created any controlling area yet and no assignment therefore.

Regards,

Aziz

0 Kudos

Hi Aziz,

Go to OB13, Check Controlling Integration in Integration section, Change it to "No maintenance of cost elements".

Please try this and check.

Regards,

Prakash

Former Member
0 Kudos

Hi Prakash,

I have only two option in OB13, either to allow Manually or create Cost element automatically.

"no maintenance of Cost element" option you have mentioned is not possible. i assume the "Blank option" is what you are have referred above.

Regards,

Aziz

0 Kudos

Hi Aziz,

Yes, try blank and check.

Regards,

Prakash

former_member198650
Active Contributor
0 Kudos

Hi Aziz,

Have you assigned profit center to the document?

Regards,

Mukthar