on 04-17-2007 5:54 AM
hi gurus,
1) I try to capture the cost of C-project.I have done the conf. setting for Account integration.but when I try conf."Make setting in ERP system" error comes
Path:
sprocollabration Project-Connection to External systemAccount integration<b>make setting in ERP system</b>
After giving RFC Destination error comes "<b>You require authorization for transaction FINR3_CPROJECTS_CUST in system QASCLNT410</b>"
2) I am using C-project 4.0 and SAP 4.7 R/3
Whether R/3 4.7 is support the C-project 4.0 for calculating the cost.( or integrating with account)
Hi Sunil,
for the point, please check the setting with SM59, which user is for the destination QASCLNT410 maintained? And then check, if the user has authority to maitain the customizing, you can check it use the involved user id to log on QAS directly.
Point 2. I think, the answer is Yes to the R/3 internal order, and definitive No to R/3 WBS element (multiple level controlling). I have seen it somewhere in consulting note or installation guide.
Kind regards,
Zhenbo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
12 | |
7 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.