on 07-28-2015 3:56 AM
Hi,
We are operating in REM Scenario.
For the same material, during one period, in a Planned Order, the difference between the Basic Start and Finish Date is nil. Whereas for another period for the same material, in a Planned Order, difference exists between the Basic Start and Finish Date (more than 7 or 8 days).
Please throw some light on the above mentioned behavior.
Regards,
R Vijayakumar
In the STD SAP bahavior when scheduling planned order planning during MRP run is backward , unless
Classic STD behavior is:
- basic finish date = requirement date
- basic start date = requirement date - in house production time ( from MRP view in material master)
- sched end date = basic finish date
- sched start date = basic finish date - lt scheudling (sum of the LT calculated per each operation of the planned order)
regards
Mauro
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can find the calculation method of basic start and finish date with the following link:
Best Regards
Tao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.