on 07-28-2015 5:43 AM
Hello Gurus,
Suddenly for a Plant , the automatic inspection lot creation at the time of Process order release has stopped to function. Can you please help in this case?
Thanks and Regards,
Amol Kale
Amole,
Check your material master QM view whether 03 in process inspection type is assigned with inspection lot creation settings.
BR
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Kiran,
We have checked further and it is seen that the Quality settings are maintained for the Plant. Also, the Materials has the QM view extended with the correct Inspection type (03 In-process insp. for production order) maintained. Also the MICs are assigned to the recipe to the Quality operation with QM03 control key.
Thanks and Regards,
Amol Kale