on 07-27-2015 5:16 PM
While changing an operation on a routing component using transaction CEWB, I am required to provide a change number. However, when I change the same component using transaction CA02, I am NOT required to provide a change number. I would think/hope the two transactions would work the same way. Is there something I am missing in the Engineering Workbench, perhaps some additional input, that will allow me to change the operation on a component for a routing without a change number?
Thanks in advance for any help you can provide,
Mike Mathieson
Hi,
it should be possible to also work without change number.
CEWB was introduced with R/3 4.6A and added some ECM capabilities on routings. But it did not change any behavior on CA02. Maybe you have history requirement on the routing respectively related BOM.
Ulf.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.