on 07-21-2015 11:26 AM
Hi Experts ,
I am stuck in problem while checking the project for charm activation.
I created a project in my solution manager . and assigned a logical component . and created a IMG for dev system.
now i clicked check before activating charm for project .
i am getting the error
Error calculating transport track for system <SID>. See application log
No track for project Z_XXX with log. system <SID>/<client>
all stms configuration is fine and no error related to STMS
ERROR IS
STMS configuration is
Please help
Thanks
Hi Pramod,
Please refer the below note.
Note 1878718:ChaRM/QGM: project configuration issues
regards,
Sumanth Babu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Pramod,
Did you check the authorization trace on your managed systems. Check on the user which is used for the read user (for example SM_**CLNT**_READ). Use also in solar_project_admin the Refresh button in the Change Management part.
It is possible that the user have not enough authorization (Object S_TRANSPRT, value 03 and object S_SYS_RWBO, domain ' , DESTSYS:P*, Activity 03)
The need for this authorization is introduced with note 2053197.
Best regards,
Richard Veldhuis
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Pramod,
Please check and confirm that you have completed TMS configuration based on client specific.
Verify Logical component has got all the systems mentioned.
Most of the time these issues occur when Client based transport layer are not defined.
check RFC connection to DEV system.
Regards
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anand,
Thank you for the rply ,
I checked
1. STMS is configured properly , All TMS rfc are working fine in all system , Consolidation route is provide from source to first target system.
2. Logical component is fine .execution check is green in manage system configuration .
every thing seems fine . dont know why this Project track error is comming .
Thanks
Pramod
Hello,
This type of error can be caused by slight discrepancy between the logical component in ChaRM and the TMS configuration, such as having the client-specific settings for the standard transport layer for the development system for , say, client 100, and the development system is in the logical component as client 101.
Most of the time this configuration will look fine to you, but it is not fine.
So, TMS and logical component are not necessarily fine, and we need more detail to troubleshoot.
Best regards,
Miguel Ariño
User | Count |
---|---|
88 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.