Dear Gurus,
i have a product which has special procurement key 30( subcontracting). i want to CIF the schedule agreement for the product to apo having the APO relevant indicator. so that the schedule lines are generated in APO.
i want the schedule lines to be generated during PPDS run itself.
but when i create an integration model for this schedule aggrement it is not selected.
please guide if i am going wrong
regards
Kiran
Dear Kiran,
Have you transferred the vendor as a location before transferring the scheduling agreement? If not, that might be the reason.
Regards,
<b><i>Ergul</i></b>
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kiran
Check you have the following set and CIFfed to SCM:
1. End product (with proc. indicator of F - though sounds like you have that).
2. All components belonging to the end product, again with proc. indicator of F
3. Vendor to manufacture end product (again sounds like you have)
4. PIR of type subcontracting which documents the vendor as the source of supply.
5. The PDS itself (assuming you are using this instead of a PPM).