cancel
Showing results for 
Search instead for 
Did you mean: 

Qm inspection type-4 for rem

jayaganapathy
Active Participant
0 Kudos

Experts,

How to do rejection and acceptance in rem for fert products

Accepted Solutions (1)

Accepted Solutions (1)

former_member190267
Contributor
0 Kudos

Hello,

Check this scenario for Repetitive manufacturing:

- Active inspection type 04 in material master for the material

- GR done through MFBF (with backflush)

- Material consumption by 261 movement for its child parts and FG good receipt through 131 movement.

- Inspection lot creation for FG material

- Inspection lot clearance through QA11 and entire stock posting to unrestricted use.

Best regards,

Natália

Answers (2)

Answers (2)

nitin_jinagal
Active Contributor
0 Kudos

Going by the context of your query,

For rejections, enter UD code with 'Reject' valuation and post the quantity into Block & for Acceptance enter UD code with 'Accept' valuation and post the quantity into Unrestricted.

NJ

anand_rao3
Active Contributor
0 Kudos

Repetitive manufacturing? Can't you use inspection type 04 and then post ok stock in to unrestricted stock while not ok in to Block stock?

Anand