Operation Level Costing

I am trying to find out how Account Assignment Push Button can be shown in the old (open) maintenance orders after Operation Level Costing functionality has been activated and configured.

I have configured the relevant node to activate Operation Level Costing, this appears to work fine for any new orders we create, but I am trying to work out how we get this functionality enabled for existing work orders. Below are two screenshots of the same order type, the first one shows a new order being created which shows the ‘Account Assignment’ button which enables us to change the WBS for each operation to capture costs at operation level but in the second screenshot we have an existing work order with same order type but the ‘Account Assignment’ button doesn’t appear in this one.


02.jpg (61338 B)
01.jpg (62029 B)