Dear Gurus,

Below is the requirement from my user in which I am trying to map the same with standard SAP instead of going to Z program.Kindly guide in the same for process which shall suit the requirement.

This is required for a formatted pick list that need to taken from SAP as printout.Below are the conditions that are proposed for.

  • Rate routing along with BOM will be generated in existing system.
  • Component allocation based on the workcentre will be done by the concurrent team.

Above is the standard one which is being followed up.

Requirement :

  • Work centre will have single BIN / multiple BIN which need to be considered while printing (ie) combination is like Work centre + BOM (materials allocated to that work centre) + concerned BINs for the materials.
  • BIN need to be defined a characteristics / non valuated material / class ?
  • How system will connect the BOM with BIN against the workcentre.?

My Queries :

Thought of going the same with class & classification but it will be a case like material can be mapped to BIN defined as a class but how will system control along with workcentre ?

Thanks in Advance.

Vignesh.V