cancel
Showing results for 
Search instead for 
Did you mean: 

Problem with GRAC_PFCG_AUTHORIZATION_SYNC GRC 10.1 AC

Former Member
0 Kudos

Good afternoon,

I have a problem with the background job that runs the program GRAC_PFCG_AUTHORIZATION_SYNC. all server resources consumed and becomes impossible to work in Dialogue.

The server currently has four core processors, but in the task manager, the monitor displays the processor 100%

Thanks for your help.

regards,

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi

Please set the parameter value 1124 Batch size for Authorization Synchronization value as 100 in SPRO--> Governance, Risk and compliance--> access control--> maintain configuration settings

Regards

Pratap

Former Member
0 Kudos

This program had a problem of indices. The ABAP team helped us solve the problem.

Thank you very much for your help.

regards,

Former Member
0 Kudos

Hi Jonathan, could you check if the job is incremental(needs to be), if it is daily. Incremental job can be Connector specific, to avoid run-time or memory issues Schedule Full Sync to  weekly/fortnightly. Regards Plaban

alessandr0
Active Contributor
0 Kudos

Dear Jonathan,

whats your current SP? SAP has released some performance notes for the auth sync job which might help to fix the issue. Can you check them:

http://service.sap.com/sap/support/notes/1901452

http://service.sap.com/sap/support/notes/1970172

Beside the improvements of the program, how do you run the job? Do you run it for more than one connector? Instead of having one job running with a variant for several connectors, try to split the jobs so that only one connector gets synced at once. To achieve that you can define several steps in a job so that these are run in sequence.

Hope this helps.


Regards,

Alessandro