on 06-29-2015 8:37 AM
Hi, All
I have inquiry regarding ChaRM project cycle.
In solution Manager Charm,
Before making a transport request, I got an error message like not linked to an active project cycle below capture file.
However, I have already activated project in solar_project_admin and also activated change cycle.
I don't know why this error message is generated in ChaRM Web UI.
and which one should I check to solve the problem.
Fyi, I attached detailed error message which was generated in pop-up.
Please give me a tip.
Thanks in advance.
Hello Eunhwa,
Please check the authorization for the user, Try assigning SAP_ALL.
Have you done consistency check on project..check if any inconsistencies are existing..
Check IBASE is maintained for Production system.
Let us know these inputs.
Regards
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Anand
I checked everything.
Firstly, I check the authorization for the user. The user was solman_admin user, and already SAP_ALL authorization was assigned.
Secondly, I chekced consistency check on project. However, there was no error.
Finally, I checked that ibase is maintained for projection system.
already production system was maintainted in ibase.
Although I checked it, I couldn't solve the problem.
Please help me.