Am facing problem with availability check if order quantity is 100 and confirm quantity is 50 system suppose to through as Availability check failed, it's not happen in ours please any one help where is the logic to control because of the so many open orders exist, we are not able doing the current orders.
Regards,
Manju
Hi,
As discussed with ABAP team gave logic as Pass VBEP-WMENG order quantity is more than the confirmed quantity VBEP-BMENG give error message.
Now issue is resolved,
Thanks for all your valuable suggestions,
Rargards,
Manjunath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
System will not perform perform background availability, system rounded 5000 But confirmed only 2000, system to give Error message.- Customer master partial delivery allowed.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manjunath,
This depends upon the way of doing ATP at the time of creation or later depending upon supplies (rescheduling BOP)
System will not perform perform background availability
What do you mean by this? You have still not mentioned where have you maintained this as asked in earlier post?
system rounded 5000
Since you have maintained partial delivery allowed, so system is proposing what it could confirm. Why would you confirm 5000 when you don't have 5000 to confirm? Why would you do over-confirmation if you don't have supplies?
But confirmed only 2000, system to give Error message
Regards
Rahul
Hi Rahul,
In this below case system will not suppose to save the orders, but system allowing saving the orders.
Order Qty | Rounded Qty | Confirmed Qty |
5,000 | 5,000 | 2,000 |
Thanks all of us replay.
Regards,
Manjunath Reddy.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Manjunath,
When you say rounded quantity 5000, does it mean "delivery unit" maintained on sales organisation 1 tab in material master or are you talking about rounding qty on MRP 1 tab (which doesn't have anything to do with this)? Plus how are you doing availability check manually or through V_V2 (running in background or foreground)?
Now, since system is confirming partial quantity, check in customer master have you allowed partial deliveries?
Regards
Rahul
Hi Manjunath,
Please check Material master : availability check field, accordingly check the configurations one by one from requirement class, req type.etc.
Please check the stock : MMBE for the material, plant,storage location combination and batch if exists.
Check in MD04 for open orders.
Thanks,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Reddy ,
kindly check whether you have maintaned or not " define default settings " in AVC in SPRO
if you maintained this settings you should get pop up if the system is not able to confirm the qty .
Regards
venkata Rami Reddy Konduri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
it may not be availability check fail.first you need to check the available stock under MMBE if it is showing 100 qty then may be other 50 qty have been confirmed to various orders.
check V_RA(back order) and see if any orders are available with confirmed qty for the material.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manju,
Your issue is not clear. Could you post some screen shots step by step for, what you are doing?
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.