Hi experts,

I Need to use the same rate table for several Charge types. But, when  I tick the rate table as multiple, it issues an error that I have to include the Charge type as calc Basis. But, I simply want to use the same percentage share for several charge types.

Has someone used this before. Any hint. I have managed to save the rate table with the flag now after having maintained everything else with another Charge type. Then, I have flagged it and it removes the Charge type.

Regards

Petra

replied

hi experts, it is possible to use a rate table for several charge types, but in 9.2 the charge types have to be included in the rate table and you still have to do separate lines for each charge type.


I found the following sap standard documentation related to this subject: