Hi all,
I am new to SAP and so I am looking for some advices
The question is the following:
The quality lot is generated by a Purchase Order.
I want to understand if it is possible to set up the system in order to define with one single Usage Decision that I want, in example, accept 80 pz out of 100 and move them from stock Q to "free" stock plus I want to send back to my vendor the 20 pz that I do not want to accept.
So far I see I can set 80 pz into "free" and 20 into "blocked" but this split is not possible when I chose to send some material back to the vendor.
(I get error message M7 136)
thank you very much
valentina
Hi Valentina,
The system always post the stock through 1 material document in QA11 even though there are 2 movement types 321 and 122 at the same time.
Means that it's not able to separate the document for respective movement types as designed.
So I'd like to suggest the following workarounds:
1) - Only post 3 for 321 without inputting UD code in QA11, so a material document will be created.
- Post 2 for 122 with UD code in QA11, an other material document be created.
- Or assign the same number range in TA OMC1
Kind regards,
Natália
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Natalia
thanks for your help.
I had the feeling it was trying to create a mixed Material Document with both the movement type...because I tested it with "single" UD ( 100% unrestricted use or 100% return to vendor) and I saw the movement 321 and 122.
So it is possible to mix the two movements only if the Material Doc that will be created has the same number range.
With your sentence:
"Only post 3 for 321 without inputting UD code in QA11, so a material document will be created"
you mean exactly that I have to fill the quantity I want to set free in Tab Inspection Lot Stock and save without filling the Usage Decision code in Tab Defect...?
I am out of the office today, I can't wait to try.
I hope it will solve also my other problem that was releasing material in Free Usage partially, so in example the warehouse can use some of it while the rest will still be locked in stock Q.
Thank you !
Hi,
after usage decision clickInspection lot stock tab & post the accepted 80 pz in Unrestricted field & rejected 20pz enter into Return delivery Field.
Note : while entering return delivery system will ask material document number,check with Purchase team & give the latest material document number,& save then system generated return delivery document as well Financial document.
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.