staging for production

Hi,

I have planned staging for the production through 2 ways.

Fixed bin replenishment & release order part.

So for example if material XYZ is needed it will be called as per the maximum qty mentioned in the material master for example maximum qty is 100

then if stock goes below minimum quantity 50 it will try to fill up the bin to 100 max.

We have question if for some production order if we need to 200 qty then as in material master max qty is 100 we will not be order it to production line bin. In this case we need to correct material master quantity. Is there any another way to handle this situation like if I am ordering for release order parts then maximum quantity should not be checked from the material master & material should be allowed to store in production line bin above its capacity( Actually in this case that material will be on production floor due to ledd capacity of the Bin.)

Thanks,

Kiran