on 06-10-2015 6:31 AM
Hi All,
We have ECC 6.0 and PI 7.0, now we are doing system copy of ECC6.0 by export and import method.
What are the precautions we have to take before doing export.
Source System Environment:
Windows 2003
ECC6.0
PI 7.0
Oracle 10G
Target System Environment:
Windows 2008
ECC 6.0
PI 7.0
Oracle 10G
We do not want to loose any configuration of source system.
Thanks in advance.
Regards
Suresh
Your BASIS team should/must be aware about all the required steps & precautions.
Please post your query to relevant place on SCN.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
9 | |
9 | |
7 | |
7 | |
6 | |
6 | |
6 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.