on 06-09-2015 1:56 PM
Hi Experts,
i facing an issue with a PR which has both service line and limit defined. The SHC created for the PR has two line items .. a service and a limit item.
So when the PO was created it created two PO .. a limit PO (HIER) and a service PO (HIER). i have checked the split criteria and all the criteria seems to be same for both line items. for eg: SHPTO, vendor, subtype etc. Please let me know what are the other possible criteria.
class CL_BBP_SC_TRANSFER->SPLIT_PO_LOC_CMP_CRITERIA -> checked all the criteria in this method.
regards,
Tashi
Hi Experts,
Please share any information related to this topic..
Regards,
Tashi