Purchase requisition created 2 POs

former_member193460
Contributor
0 Kudos

Hi Experts,

     i facing an issue with a PR which has both service line and limit defined. The SHC created for the PR has two line items .. a service and a limit item.

So when the PO was created it created two PO .. a limit PO (HIER) and a service PO (HIER). i have checked the split criteria and all the criteria seems to be same for both line items. for eg: SHPTO, vendor, subtype etc. Please let me know what are the other possible criteria.

class CL_BBP_SC_TRANSFER->SPLIT_PO_LOC_CMP_CRITERIA -> checked all the criteria in this method.

regards,

Tashi