cancel
Showing results for 
Search instead for 
Did you mean: 

Change dependence type

Former Member
0 Kudos

Hello,

Is it possible to change dependence type?

ex. there are dependencies of type action which need to be converted into procedure, so is it possible to this ? also is it possible though any mass maintenance transaction or report?

Cheers

John

Accepted Solutions (1)

Accepted Solutions (1)

former_member214775
Contributor
0 Kudos

Hi John,

it is possible with CU02.

Maybe it is only possible when:

- it is not yet used

- there is not any code in the dependency editor

Best regards

Tamas

Answers (1)

Answers (1)

Ritz
Active Contributor
0 Kudos

John Dev,

I don't think its possible , atlest i haven't heard of it.

If numbers are low you can create it manually and assign the newly created to replace the obsolete ones. If numbers are high you can think of LSMW or BDC to get it done.

Thanks

Ritesh