Dear Expert’s,
I faced the problem while click on saving/check the release budget in CJ32. Basically it’s happened after run the PS settlement. (During the settlement run I face problem “Budget exceeded” and then I run Budget deactivated by CJBW then settlement run perfectly.) I thing/ perhaps here have mistaken in configuration. Please all GURU/Experts make helping hug to resolve this issue as soon as possible.
In bellow I shear my configuration on Settlement Profile, Network Settlement Profile, network Profile, Planning Profile, Budget Profile, Availability control and project profile.
1. Problem
2. Settlement Profile
Project Profile Planning Board Tab
Project Profile Controlling Tab:
3. Settlement Profile
4. Network Settlement Profile
5. Planning Profile
6. Budget Profile
7. Project Availability control (Tolerance Limit)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Folk,
Could you please help me to get this note:
1935079 - Error message BP604 budget exceeded during settlement
It seems SAP has been removed it & facing the same issue at the time of CJ88.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All.
My Problem Have been successfully solved.
Thanks for all of your support.
Regards
Hamayet Rasel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Hamayet,
I am also facing with same issue . I have a 3 level of WBS & I am tried to settle the 1st level WBS to cost center as all cost are roll up to first level , but it it gives error Maintain settlement rule of sender & if i assign settlement rule for lower level WBS &sender as upper level WBS then system is throwing error of Item 001 WBS element xxxxxxx Budget exceeded , message no. BP604. I think it may be roll up double cost to upper level WBS from lower level WBS.
Now I don't understand that whether I am doing something wrong process or system error because I am doing this process first time . Please help anyone ASAP.
Thanks ,
Virendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Hamayet ,
Thanks for your reply , here I am sharing Screen shot of Error message please go through it also as mentioned above I have 3 levels of WBS & I have to settle the cost to Cost center (Either Project definition or first level WBS) . Also let me know your settlement steps.
Thanks ,
Virendra
Hi Virendra,
In standard, system should not give a message like that at settlement, so refer this note, if you didn't come across the two solution mentioned in the note, then you need to raise to SAP.
Refer below note
1935079 - Error message BP604 budget exceeded during settlement
Regards
Terence
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.