on 05-25-2015 11:54 AM
Hi
I have configured Product cost planning in a Sandbox system and I am facing following issue while performing Cost estimate using t-code CK11N.
Activity cost in itemization is shown as 0 ( item category E ).
I am specifying Finished Good as input in CK11N, and this has a Semi-Finished Good and a Raw material in BOM. I have also maintained BOM for SFG.
Similiarly I have also maintained Routing for FG & SFG. I am using three activity types in operation and maintained price in KP26 for combination of Fiscal year, Cost Center & Activity type.
In Valuation variant - I have specified Strategy Sequence as 'Plan Price as Average of All Fiscal Year Periods' and Version as '2'.
While executing CK11N, I am specifying version 'Costing Version' as 2.
Appreciate feedback about why activity cost is not shown in cost estimate.
-Thanks
Kapil
Hello,
Please check whether Note 1872228 is implemented.
Please run KSPI and check again the result.
BR,
Owen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Owen
Please check attached screenshot of KP26 for one activity Labor. In KP26 - For version 0 & 2, I have entered 'Plan Activity' as 5,000 & 'Fixed Price' as 12,000 for period 1 - 12 of Fiscal year 2015.
System automatically divides 5000 into 416.667 per period.
After this, I executed KSPI as'Test Run'. It shows entire 'Activity Quantity' of 5000 in period 1 only and shows 0.00 as quantity in period 2-12. In all periods, it shows 'Total Price' as 0.00.
Do I need to execute KSPI without 'Test Run' ?
In CK11N, I have specified costing version as '2'.
Appreciate your feedback.
Hi Kapil,
It seems you have done all the relevant mapping/config but still the activity cost is coming zero.
Please check routing once(T code-CA03) whether costing relevancy is selected or not.You can find this in operations-general Data.
Please check and confirm and if possible please take help from your PP consultant.
Regards
Eugene
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Thanks for feedback.
Both SFG & FG have Costing relevancy marked as "X".
I have specified following dates while executing CK11N. Can this cause be causing some problem due to which system is not able to pick activity cost ?
Costing Date From 25.5.2015
Costing Date To 31.5.2015
Qty Structure Date 25.5.2015
Valuation Date 25.5.2015
-Regards
Kapil
Hii kapil
1) As per your post activity price values would get picked from based on kp26 planning and routing master data CA02
In KP26 planning we will mention how much amount for the individual activity types.
2) After that important thing is in work center - costing tab we have to maintain for which activity types you maintained the cost center based on that you have to give the cost center after that activity types automatically popup the activity types for that activity types we need to mention the formulas for that belonging activity types.
3) Now go to routing master inCA02. Here we need to mention the hours performing by each activity type we need to maintain in routing.These things first we have to configure before going to costing variant.
4) Coming to costing variant in valuation variant tab we need to maintain the strategy sequence
A) Most up to date plan price
B) Plan price for the period
C) Actual price for the period.
5) Based on that system will check the priority what you maintained in activity types/process tab.
6) Finally in quantity structure control we need to mention routing determination as 01 category in routing tab.
Based on this configuration activity prices would be reflected in ck11n standard cost estimate.
Please give me reply for any clarifications
Thanks&Regards
Harinath
Hi
Try doing Cost calculation for bigger lot size.
Check the validity dates and quantity of routing.
Check whether activity quantities are maintained in routing.
Rajneesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Rajaneesh
I tried by entering lot size 100 as input in CK11N. Activity price still does not show up.
Though Routing for FG/SFG shows Activity quantities, but in CK11N itemization activity quantity is 0.0 HR
BOM/Routing master data of FG/SFG is valid from 19.5.2015. In CK11N, I have given following dates -
Costing Date From 25.5.2015
Costing Date To 31.5.2015
Qty Structure Date 25.5.2015
Valuation Date 25.5.2015
I am not sure why system is showing activity quantity as 0.0 HR in cost estimate.
-Regards
Kapil
Hi Kapil,
Have you maintained plan cost in KP06?
Thanks,
Sitaram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.