Reorder point planning in apo

Dear Experts

I am planning consumption based plan in sapapo .

My finished material is having 2 level BOM . I have maintained Mrp type as x0 Lot size as EX  and reorder point for 2000 ,consumption mode 2 Backward consumption 10 Forward consumption 99 in mrp3 and I have cifed material to APO changes have been replicated in APO

When I am running planning heuristics sap-PP-007 .Planned order are not getting generated in correct order multiple planned order are getting generated .

And also charcterstics are missing while generating planned order like width length colour etc

How to over come this ??

Regards

Virender