Dear All,
I have to create 2 cost component structure and they are:
1 | RAW MATERIAL - LOCAL | 400090 | 406678 |
2 | RAW MATERIAL - IMPORT | 400100 | 400151 |
Now issue is the cost elements are overlapping. When I try to use cost element group instead of cost element system is showing message that "The values entered cannot be accepted."
Please suggest how can this be rectified.....
Regards
Nitisha
Hi Nitisha
You are assigning CE Gr which is overlapping in between 2 attributes..
See the Import range 400100 to 400151 which is within Local range 400090 to 406678
system will not allow because how would system distribute cost of same CE in 2 attributes..
So..break the local CE Gr into 3/4 part keeping Import related CE 400100 to 400151 outside that Grps
and assign all local grs to Local RM attibutes ...it will work
Kamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
System should not accept the same cost element in multiple cost components.
Better to avoid the range option while creating the the cost components.
Still you need the expected requirement, better to go for Auxiliary cost component structure.
Auxiliary cost component structure provides the break up of main cost component structure.
Regards,
Pavan Kumar Arvapally.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Is it same valuation class that your are using for both?
Regards,
Pardhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.