on 04-30-2015 11:54 AM
In the production order we have only one operation. Workcenter for that operation is having production supply area
We have 10 production supply area. Currently in the BOM storage location is coming from material master production storage location.
As we are planning to use SAP WM. I want that production order storage location in PSA should be same with Storage location of component.
As same material can be used in multiple production line & I can enter only one production storage location in material master. I am finding it difficulte to match Sloc of PSA & sloc of component of the production order.
What can be alternative ways so that I can have Sloc of PSA & sloc of component of the production order as same.
You can maintain the proper production storage location / PSA for the components in the BOM (CS01/CS02 or mass maintenance in CEWB), this will copied into the component list of your production order..
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jurgen.
So even if work center in the operation of the production order is linked to PSA AAA ( Storage location for PSA AAA is 0001)
I can have PSA BBB (Storage location for PSA BBB is 0002) in Bom.
So I will maintain control cycle with reference to PSA BBB & material will be consumed from Sloc 0002 ?
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.