Hi Team,
Here my client required to keep his stock in the form of Minimum & maximum stock for Material.
Let me explain with an example.
Material =Pen
In Stock it should be always 5 & maximum 10, when it falls below 4 it should generate PR & should not cross maximum limit 10.
if in stock 3 pens r there it should generate PR for 7 , If 4 then PR for 6
Please help me for it ASAP.
Regards
Mahantesh
Hi Mahantesh,
For this you need to maintain below settings in material master for your material.
In MRP1 view,
Define MRP Type: V1
Define Reorder Point: 5
Define MRP Controller:
Lot Size: HB (Replenish to max. stock)
Define Maximum stock level: 10
After this material master settings in MRP 1 view, test the results by running MRP for the material.
Keep the stock at different levels like 3, 4 and 6 for the material before MRP run.
You will get the results as per your business requirements.
Regards,
Naresh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
i am not able see that rewarding tab.. can u plz help out for it
Regards
Mahantesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.