SAP for Oil, Gas, and Energy Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and navigate the evolving energy landscape. Join the conversation today!
cancel
Showing results for 
Search instead for 
Did you mean: 

TD Shipment: Gain loss vs material on board

Former Member
0 Kudos

In a TD Shipment, if the entire loaded quantity is not delivered, is there always a gain/loss posted on closing the shipment? Can we have the remaining(load - discharge) quantity on board (on the vehicle), so that it can be used for delivering under different shipment?

Is there some customizing/ BADI to maintain (activate) these features?

1 REPLY 1

Former Member
0 Kudos

In Delivery confirmation, you can use the 'Left On Vehicle' feature to retain the left over quantity in the Transport Unit's compartment. This avoids the load minus discharge difference posting and this quantity remains in the intransit storage location, from IM point of view. In a subsequent shipment where the same Transport Unit is in use, the left over quantity can be counted on as part of the load (using 'Prior To Load' feature) for which no transfer posting happens b'cos the material is already on-board (provided the dynamically determined storage location is same). It is also possible to rebrand this left over material segment if it differs from the current material segment being dispatched in which case a transfer posting happens.