How to configure CVC automation process using SNP master data and BI customer master data

Former Member
0 Kudos

Hi Gurus,

How to configure CVC automation in MPOS structure technically, using SNP master data in CVC creation such as Product and location details

and in parallel extract date from ECC to BI customer master data in DP. Where-in a APO BI cube should have only new combinations which are to be validated with ECC and existing combinations in the MPOS structure before creation of CVC in different regions of MPOS.

Second the automation should also check certain validations of product, location and are part of SNP-ECC master data and are these new combinations.

Could someone guide us in this process.

Thanks

Kumar

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Dogboy,

Thanks for the solutions, We can provide the basic details of the business requirement. Like Master data should be coming from SNP and BI where, CVC in DP needs to be created for only those product_ location combinations which are in SNP which needs to be automated in APO BI cube by a start routine for each region specific cube , as this becomes the source for master data creation for DP MPOS structure.

Thanks

Praveen

Former Member
0 Kudos

Praveen,


We can provide the basic details of the business requirement.

That's great.  Gathering business requirements is the first step in any project.  Having these settled beforehand means you are ahead of the game.  

Best Regards & Good Luck,

DB49

Former Member
0 Kudos

Praveen,
The short answer is to move the data into infoproviders or flat files for all of the 'characteristic-type' source data; and then copy CVCs from the infoproviders into the Planning area, probably using one or more Process Chains (program /SAPAPO/TS_PLOB_MAINTAIN).

The long answer is that this is not a trivial undertaking; this could end up being a pretty involved solution.  If you do not have enough BW/DP expertise available locally to create this solution for you, then I recommend you consider engaging external resources to assist you.  I personally wouldn't even consider starting to work on such a solution without first knowing a lot more about the detailed business requirements, and about any existing solutions that may already in place.  An SCN forum is not really suitable for such an answer.  In my opinion, the BBP doc alone would be 20+ pages, assuming no enhancements..

Best Regards,
DB49