on 04-12-2015 8:17 AM
Hi,
When we are working for a LSP scenario, we add have multiple stages captured in FWO.However for a shipper scenario which document is used to capture multiple stages since at the outset OTR/DTR always have a single location. If we want to have multiple stages for on cariiage pre carriage data to be captured ina shipper scenario, do we always need to add stages in the corresponding FU and achieve this functionality?
Hi Deepak,
Make a Default Route in the NWBC between your Shipping Point and the Ship-to Location with all the desired stages. Then in the FU use 'Apply Default Route' button to adopt these stages.
This should work.
FYI-If in an FWO, the 'Apply Default Route' check in the FUBR does this.
-BR
narender
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thx.Since its a shipper scenario with no FWO concept here, I hope default route functionality works?
Secondly do we need to maintain movement type and stage type concept in shipper scenario ( no FWO is here) since I thought movement type config is applicable only for a LSP scenario where FWO is involved.
This would call for setting up the LE configuration in ECC side.
You do have the provision to maintain Routes there also (which is a connection of something called as Transportation Connection Points- these are parallel of Transshipment Location in TM)
You can determine routes in an SO as well as re-determine them in a Delivery.
-BR
narender
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.