Bill of material with different quantity required to calculate the needs

former_member232086
Participant
0 Kudos

Team,

Am aware that in the BOM query we can add multiple items  but in the quantity required the selection is single.

Eg; for the items A &B I have requirement for 5 for A and 10 for B , if am running BOM it will be based on item by item

Means I need to run BOM for item a with  quantity 5 and item B with quantity 10 in the same time

Is it possible or in BOM or is there any other standard report in sap

Thanks to help.

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Vijesh,

In BOM explosion when you enter a required quantity, the system calculates the component quantity.

When you explode a multiple BOM, you enter either the required quantity or the alternative.

As per the SAP help,

The saddle support of a bicycle consists of the components seat pillar and tube.

If the base quantity is 1 piece, the component quantities are as follows:

Seat pillar: 1.000 piece
Tube : 0.250 M

If the required quantity is 200 pieces, the component quantities are as follows:

Seat pillar: 200.000 pieces
Tube : 50.000 M

Multiple requirement quantity is not possible you can develop the custom report by using BAPI

CS_BOM_EXPL_MAT_V2 multi level explosion, simular to CS12 functionality.

Best Regards,

R.Brahmankar