Production- How to define BOM & Routing ?

Hi Experts,

Need your suggestions on the below scenario.


We have totally 4 operation - W, X , Y, Z.


Operation W - consuming one material to produce 10 materials (i.e. SFG's).


Operation X - 10 SFG's are consumed in the operation X, along with the 2 raw materials to produce is 4 materials/SFG.


Operation Y - 4 SFG's are consumed in the operation Y, along with the 3 raw materials to produce 4 materials/SFG.


Operation Z - 4 SFG's are consumed in the operation Z , along with the 10 raw materials to produce 1 FG.


Req: Needs to monitor the quantity consumed for each SFG and their production costs also.


Pls advise how to define the BOM and routing.